I drove down Fort Street the other day and was surprised to see concrete support pillars popping up along the Ambassador bridge near the truck customs area. Is Manny Maroun getting a jump on everyone by starting to build the bridge before all the ducks are in a row? |
 
Viziondetroit Member Username: Viziondetroit
Post Number: 1599 Registered: 11-2003
| Posted on Wednesday, April 02, 2008 - 9:02 pm: |   |
I was thinking the same thing when I went by there... I saw those concrete pillars as well, kinda odd to me. |
 
Detroithabitater Member Username: Detroithabitater
Post Number: 133 Registered: 10-2006
| Posted on Wednesday, April 02, 2008 - 9:03 pm: |   |
didn't somebody mention something about a similar think happening on the windsor side? |
 
Guideboat Member Username: Guideboat
Post Number: 18 Registered: 02-2008
| Posted on Wednesday, April 02, 2008 - 9:11 pm: |   |
I'll snap some pics the next time I go by there. |
 
Yupislyr Member Username: Yupislyr
Post Number: 279 Registered: 07-2004
| Posted on Wednesday, April 02, 2008 - 9:27 pm: |   |
Yeah, it's already been done on the Windsor side. A short approach for a twinned bridge has been built right beside the Ambassador, with additional toll booths and everything. It looks to be pretty much all done and just waiting for a bridge to actually connect to, but it's all blocked off by concrete dividers in the meantime. |
 
Yupislyr Member Username: Yupislyr
Post Number: 280 Registered: 07-2004
| Posted on Wednesday, April 02, 2008 - 9:38 pm: |   |
It looks to be mainly a big twirling ramp and toll plaza that's just going to connect to the existing bridge for now. I took a screenshot from this document: http://www.michigan.gov/docume nts/mdot/MDOT_Gateway_Project_ Newsletter_Feb-Mar_2008_Englis h_224540_7.pdf |